BLOGGER TEMPLATES - TWITTER BACKGROUNDS »

My final music video

Wednesday, November 4, 2009

Shooting

Ok so we had a scheduled shoot for 31st Oct and 1st Nov.
We managed to have a really good day of shooting on the 31st, however due to torrential rain on the sunday we were unable to shoot.
We cancelled the shoot purely because we knew that even if we did go to Bricklane and film, we would only be travelling home wet and upset with our footage as rain doesn't look good on film.
Therefore we have decided to re-schedule for either saturday 7th or sunday 8th.
Depending on weather and timings of cast and crew.


31st October

We met at 10 at Starbucks in Carnaby, however with having to sort out make-up and costume we didnt start filming until 11.30.

Admittedly, the beginning of the day seemed to drone on, purely because I dont think we planned ourselves well enough and writing up a much more detailed shooting schedule would have really helped us. However, saying this, we managed to get some really nice shots in some great locations.

We did forget to do atleast 5 shots of which we had already done in a test shoot, but i'm not too worried about this as it can be done on our Bricklane shoot.

Sian our actress did really well i thought, considering the amount of people out in london on the day. She managed to perform well and keep her cool. Although, as we drew nearer to 4 o'clock it was obvious herself, along with the rest of the group were getting tired. We had been shooting from 10-4 with a small lunch break in between.

We managed to shoot in both Carnaby and Soho which was really good. And decided we were going to experiment greatly with trying out lots of different shots with the scenery.

0 comments: